Skip to content
Paving Alliance
Contracts & Change Orders

Signed, tracked, and in the budget the same day.

E-sign proposals and change orders, track contract changes without chasing paper, and keep progress billing tied to the real scope.

The Problem

Why this matters

Change orders agreed on a handshake are the most common way a profitable job turns into an argument about what was owed.

What it does

  • E-sign capabilities for proposals and change orders
  • Effortless tracking of contract changes
  • Real-time budget tracking
  • Seamless progress billing
Walkthrough

3 walkthroughs, straight from the build team.

Published by the Job Cost Portal team. Nothing loads from YouTube until you press play.

  • How to create a Change Order?YouTube
  • How to create a Cost Plus Contract?YouTube
  • Generate a ContractYouTube

See the full walkthrough library or visit the channel.

Related

Every module reads from the same job record — which is the point.

Job Costing

Estimating & Proposals

Build clear, accurate estimates from consistent pricing, send proposals fast, and turn an approved bid straight into a job.
Job Costing

Job Costing

Track labor, material, equipment, inventory and overhead against the estimate. Catch overruns early. Track profit daily, in real time.
Operations

Labor & Time

Tie field hours directly to job costs, handle 8/40 overtime rules, and apply labor burden so the number hitting the job is the real one.

Is operations what's holding you back?

The assessment scores it against four other areas, so you fix the thing that actually matters first.

Free · About 10 minutes · No obligation