Glossary
The words, defined plainly.
Paving, contract and job-costing terms — with a note on why each one actually matters to your margin.
24 terms
- 8/40 overtime Labor
- An overtime rule requiring premium pay after 8 hours in a day or 40 hours in a week, whichever produces more.
- Paving crews routinely run long days in short weeks, so daily overtime frequently applies where weekly overtime wouldn't.
- Backlog Finance
- Contracted work not yet performed — the revenue you've already sold but haven't yet built.
- Backlog is the earliest reliable signal of next season's capacity problem or revenue gap.
- Change order Contracts
- A documented modification to the contract scope, price, or schedule, agreed after the original contract is signed.
- Work performed on a verbal change order is the most common way a profitable job becomes a dispute.
- Cost code Job Costing
- A standard identifier applied to every cost so that labor, material and equipment can be grouped consistently across jobs.
- Without a shared coding structure, two jobs can't be compared and historical cost can't inform a bid.
- Crack fill Paving
- Sealing cracks in existing asphalt to stop water reaching the base, typically with a hot-applied rubberized material.
- Estimated vs. actual Job Costing
- A comparison of what a job was bid to cost against what it has actually cost so far, broken down by category.
- It is the single most useful number in a contracting business, and only useful while the job is still running.
- Full-depth reconstruction Paving
- Removing the existing pavement and base entirely, then rebuilding the section from the subgrade up.
- Gross margin Finance
- Revenue minus direct job costs, expressed as a percentage of revenue. Excludes general overhead.
- Labor burden Labor
- The cost of an employee beyond their base wage — payroll taxes, workers' compensation, general liability, benefits, and paid time off.
- Burden commonly adds 30–40% on top of a wage. If it isn't in your job cost, every margin you look at is overstated.
- Lien waiver Contracts
- A document in which a contractor or supplier waives lien rights against a property, usually exchanged for payment.
- Liquid asphalt (AC) Paving
- The petroleum binder in an asphalt mix. Its price moves with crude oil and is the most volatile input in a paving bid.
- AC price movement between bid and build is a common and often unhedged source of margin loss.
- Mill and overlay Paving
- Grinding off a specified depth of existing asphalt and paving a new surface course over the milled surface.
- Mobilization Paving
- The cost of getting crew and equipment to a site and set up to work, incurred whether the job is large or small.
- Under-recovered mobilization is why small jobs so often lose money on otherwise correct unit pricing.
- Net margin Finance
- What remains after all costs including overhead, expressed as a percentage of revenue.
- Over/under billing Finance
- The difference between what you've billed on a job and the revenue actually earned by work completed to date.
- Prevailing wage Labor
- A legally mandated minimum wage and benefit rate for workers on certain publicly funded projects, set by classification.
- Prevailing wage jobs need separate labor tracking and reporting — a general payroll report won't satisfy the requirement.
- Progress billing Contracts
- Invoicing for a portion of the contract as work is completed, rather than in a single payment at the end.
- It's how a contractor funds a long job without financing the customer.
- Retainage Contracts
- A percentage of each payment withheld by the customer until the project is complete and accepted — commonly 5–10%.
- Retainage is real money you've earned and can't spend. Tracked badly, it quietly becomes the largest receivable you have.
- Schedule of values Contracts
- A breakdown of the total contract price into line items, used as the basis for progress billing.
- Sealcoat Paving
- A protective surface treatment applied over asphalt to slow oxidation and water intrusion. Maintenance, not structural repair.
- Subgrade Paving
- The native soil beneath the aggregate base that ultimately carries the pavement load.
- Most premature pavement failure is a subgrade problem, not a surface problem.
- Tack coat Paving
- A thin bituminous layer sprayed between pavement lifts to bond the new course to the existing surface.
- Unit price Job Costing
- A price per measured unit — per ton, per square foot, per linear foot — rather than a single lump sum for the job.
- Work in progress (WIP) Finance
- A schedule reconciling costs incurred and revenue recognised against billings on jobs still in progress.
- The WIP schedule is where over- and under-billing shows up. Bonding companies and lenders read it first.