Glossary

The words, defined plainly.

Paving, contract and job-costing terms — with a note on why each one actually matters to your margin.

24 terms

8/40 overtime
Labor
An overtime rule requiring premium pay after 8 hours in a day or 40 hours in a week, whichever produces more.
Paving crews routinely run long days in short weeks, so daily overtime frequently applies where weekly overtime wouldn't.
Backlog
Finance
Contracted work not yet performed — the revenue you've already sold but haven't yet built.
Backlog is the earliest reliable signal of next season's capacity problem or revenue gap.
Change order
Contracts
A documented modification to the contract scope, price, or schedule, agreed after the original contract is signed.
Work performed on a verbal change order is the most common way a profitable job becomes a dispute.
Cost code
Job Costing
A standard identifier applied to every cost so that labor, material and equipment can be grouped consistently across jobs.
Without a shared coding structure, two jobs can't be compared and historical cost can't inform a bid.
Crack fill
Paving
Sealing cracks in existing asphalt to stop water reaching the base, typically with a hot-applied rubberized material.
Estimated vs. actual
Job Costing
A comparison of what a job was bid to cost against what it has actually cost so far, broken down by category.
It is the single most useful number in a contracting business, and only useful while the job is still running.
Full-depth reconstruction
Paving
Removing the existing pavement and base entirely, then rebuilding the section from the subgrade up.
Gross margin
Finance
Revenue minus direct job costs, expressed as a percentage of revenue. Excludes general overhead.
Labor burden
Labor
The cost of an employee beyond their base wage — payroll taxes, workers' compensation, general liability, benefits, and paid time off.
Burden commonly adds 30–40% on top of a wage. If it isn't in your job cost, every margin you look at is overstated.
Lien waiver
Contracts
A document in which a contractor or supplier waives lien rights against a property, usually exchanged for payment.
Liquid asphalt (AC)
Paving
The petroleum binder in an asphalt mix. Its price moves with crude oil and is the most volatile input in a paving bid.
AC price movement between bid and build is a common and often unhedged source of margin loss.
Mill and overlay
Paving
Grinding off a specified depth of existing asphalt and paving a new surface course over the milled surface.
Mobilization
Paving
The cost of getting crew and equipment to a site and set up to work, incurred whether the job is large or small.
Under-recovered mobilization is why small jobs so often lose money on otherwise correct unit pricing.
Net margin
Finance
What remains after all costs including overhead, expressed as a percentage of revenue.
Over/under billing
Finance
The difference between what you've billed on a job and the revenue actually earned by work completed to date.
Prevailing wage
Labor
A legally mandated minimum wage and benefit rate for workers on certain publicly funded projects, set by classification.
Prevailing wage jobs need separate labor tracking and reporting — a general payroll report won't satisfy the requirement.
Progress billing
Contracts
Invoicing for a portion of the contract as work is completed, rather than in a single payment at the end.
It's how a contractor funds a long job without financing the customer.
Retainage
Contracts
A percentage of each payment withheld by the customer until the project is complete and accepted — commonly 5–10%.
Retainage is real money you've earned and can't spend. Tracked badly, it quietly becomes the largest receivable you have.
Schedule of values
Contracts
A breakdown of the total contract price into line items, used as the basis for progress billing.
Sealcoat
Paving
A protective surface treatment applied over asphalt to slow oxidation and water intrusion. Maintenance, not structural repair.
Subgrade
Paving
The native soil beneath the aggregate base that ultimately carries the pavement load.
Most premature pavement failure is a subgrade problem, not a surface problem.
Tack coat
Paving
A thin bituminous layer sprayed between pavement lifts to bond the new course to the existing surface.
Unit price
Job Costing
A price per measured unit — per ton, per square foot, per linear foot — rather than a single lump sum for the job.
Work in progress (WIP)
Finance
A schedule reconciling costs incurred and revenue recognised against billings on jobs still in progress.
The WIP schedule is where over- and under-billing shows up. Bonding companies and lenders read it first.